D.1.1.  Kick-off workshop proceedings
Febbraio 2009 D.7.  Definition of the monitoring protocol, the monitoring indicators and source of verification
Marzo 2009 D.1.2.   Detailed project work plan
Maggio 2009 D.8.1. Publication of web site for the project
Giugno 2009 D.9.   Contingency Plan
Settembre  2009 D.2.1.  Report on data collected and analyzed
Settembre 2009 Inception Report
Luglio 2010 D.4.1.  Report on future climate scenarios defined for the case study area
Luglio 2010 D.4.2.  Report on Sea level rise projections for the case study area
Gennaio 2010 Mid-term Report
Gennaio 2011 Progress Report n°1
Gennaio 2011 D.2.2.  Report on Esino River monitoring campaign
Gennaio 2011 D.2.1.  Report on acquifer monitoring campaign
Febbraio 2011 D.2.2.  Report on the GIS plus map of Iso-piezometric map of the current situation
Maggio 2011 D.3.    Report on the costruction and calibration of integrated models
Settembre 2011 D.5.   Report on remediation action simulated with the integrated models plus the expected thematic maps.
Settembre 2011 D.6.1.  Report on scenarios construction for the Esino basin area
Settembre 2011 D.6.2.  Report on definition of a Regional Risk Assessment methodology
Settembre 2011 D.6.3.  Report on groundwater impact and risk assessment for the case study area sources of verification
Giugno 2011 D.8.3.  Conferences material (invitations, papers, etc.)
Ottobre 2011 D.8.2.  CD-ROMs containing project results
Dicembre 2011 D.8.3.  Publication of project summary in specialised magazines
Gennaio 2012 D.10.  Report of the independent auditor
Febbraio 2012 Final Report
 